volume estimation

98%

Volume estimation accuracy

single point survey

5cm

Single point survey accuracy

faster

10x

Faster work completion - results in single day

3D

3D

Visualization for easy mine planning & monitoring

Use Cases

stockpile-volume-estimation

Stockpile volume estimation

  • Very quick stock surveys.
  • Stockpile surfaces are digitized with millions of data points.
  • Combined with PPK technology, generate most accurate volume measurements.

Traditional survey techniques like total stations fail to capture small crests and troughs of stockpiles, thus offsetting the final volume estimated by about 10-30%.

mine-planning

Mine planning

  • Plan efficient and safer mine operations.
  • Quickly chalk out haul roads, pit, and mine reclamation plans.
  • Meet planning compliances with ease.
site-survey

Site survey

  • Perform regular site surveys in a matter of hours.
  • Regular surveys enable 3D visualization, helps easy tracking of changes over a period.
  • Use the data with any user preferred planning software.
environmental-assessment

Environment Analysis

  • Vegetation cover measurements; Tree count.
  • Compliance assessment.
blast-planning

Blast Planning

  • Digitized 3D models enable geologists to plan blast design efficiently.
  • Optimize earthwork operations.
water-flow-planning

Water flow planning

  • 3D outputs enable efficient planning of watershed, flood flow, and drainages.
  • Identify bench failures due to water flow etc.
asset-mapping

Asset mapping

Identify and map all the mining assets like trucks, earthwork heavy machinery, tools, pillars, electrical equipments and their precise geo-locations and plan to deploy in more optimized manner.